Click on the form name to download a PDF form of the documented requested. Paper copies are available at our office.
| Click to Download |
|
Subject to Change |
|
Approval Not Required Plan |
$300.00 |
|
Preliminary Subdivision Plan |
$1,000.00. This cost may be applied towards the cost of a Definitive Subdivision based on a valid, approved Preliminary Subdivision Plan. |
|
Definitive Subdivision Plan |
$3,000, plus:
- Application fee of $500 per lot when combined with a special permit application (other than Common Driveway) OR $1000 per lot;
- $350.00 for advertising and mailing; and,
- Deposit to pay for outside consultants in the amount of $1200 for the first 1200 feet, plus $5.00 per linear-foot of roadway thereafter towards the cost of any outside consultants, as per §11.1 of the Subdivision Rules and Regulations. The applicant will be responsible for the total actual cost of engineering review. This should be submitted as a seperate check.
|
|
|
Modification of a Definitive Subdivision Plan |
Minor $300.00 Major $1500.00 plus $350.00 for advertising and mailing notices up to actual costs incurred.For a Major Modification, the applicant should also submit a $1000 deposit towards review by outside consultants, as per §11.1 of the Subdivision Rules and Regulations |
|
|
Performance Covenant for a Subdivision |
None* |
|
Certificate of Performance (for lot release) |
None |
|
|
Bond/Lot Release Form (to request inspections on Subdivisions) |
$200 |
|
Special Permit: Estate Lot |
$1500; plus $350.00 for advertising & mailing |
|
Application for a Special Permit to Construct a Common Driveway |
$350.00 for advertising & mailing, Plus:
|
| Aquifer Protection District |
| Word |
|
Special Permit: Aquifer Protection |
$1000.00 plus a minimum $2000.00 review fee up to actual costs incurred; plus $350.00 for advertising and mailing notices up to the actual costs incurred |
|
Special Permit: Open Space Residential Development |
$3000.00 |
| Residential Compound |
| Word |
|
Special Permit: Residential Compound |
$3000.00 |
|
Special Permit: Adult Retirement Development |
$3000.00 |
|
Modification of a Special Permit |
- Minor: $300.00
- Major: $1500.00, plus a minimum $1000.00 review fee up to actual costs incurred; plus $350.00 for advertising and mailing notices up to the actual costs incurred.
(Note: When modifying a Special Permit and the Definitive Subdivision Plan, both fees apply) |
|
Site Plan Review |
For New Construction:
UP TO 10,000 S.F. BLDG: $1,500
10,000-24,999 S.F. BLDG: $2,500
25,000-99,999 S.F. BLDG:$4,000
100,000+ S.F. BLDG: $6,500
For Change of Use, Additions of up to 50% of Existing Square Footage, or Parking Lot Expansions of up to 50% of Existing Area:
UP TO 10,000 S.F. BLDG: $500
10,000-24,999 S.F. BLDG: $750
25,000-99,999 S.F. BLDG:$1,000
100,000+ S.F. BLDG: $1,500
PLUS $1000 deposit towards stormwater review (if applicable, see SRR Section 8). Applicant will be responsible for full cost of reveiw. |
|
Street Acceptances |
$500.00 per street |
| Application for Plan Approval |
For use in the Queset Smart Growth Overlay District |
A filing fee of $1,500 to cover Town administrative costs, an advertising fee of
$350, and an initial deposit of $15,000 to cover consulting costs |
|
|
Informal review of any application |
First time, free. Second time+, $200 |
*A “Covenantor” or successor in title shall be required to complete a roadway and all related improvements within two years from the date of endorsement of the subdivision plan. If a one year extension is required, a fee of $500.00 shall be paid for this initial extension. A fee of $5000.00 shall be payable to the Town of Easton for each separate one year extension required thereafter.
**If a way is not being created under the Subdivision Control Law to provide lot frontage for applications submitted under Section 7-15 ( Open Space Residential Development ), the existing total frontage of the parcel shall be used in calculating the per linear foot review fee. If there are more than two sides of the parcel with legal frontage, the longest side of the parcel will be used in the calculation.
5. Pursuant to M.G.L. c.44, §53G, any Applicant may take an administrative appeal from the selection of the outside consultant to the Board of Selectmen. The grounds for such an appeal shall be limited to claims that the consultant selected has a conflict of interest or does not possess the minimum required qualifications. The minimum qualifications shall consist of either an educational degree in or related to the field at issue or three or more years of practical experience in the field at issue or a related field. The required time limit for action upon an application by the Board shall be extended by the duration of the administrative appeal. In the event that no decision is made by the Board of Selectmen within one month following the filing of the appeal, the selection made by the Board shall stand.